Talin Power Plant Combined Cycle Renewal Project

Project Description

Background

To meet the long-term demand for growing electricity loads and anticipate the future large-scale grid connection of renewable energy in southern Taiwan, Taipower Company is developing a gas-fired unit renovation and reconstruction project at the Talin Power Plant (hereinafter referred to as this “the project”). The project utilizes the vacant land after the demolition of the existing #3 and #4 units and the remaining space within the plant as the primary planned land. It plans to construct two one-to-one gas fired combined cycle units with a total installed capacity of 1.1 million kilowatts.

 

Project Location and Scope

The project will be built within the Talin Power Plant, utilizing the vacant land after the demolition of the existing #3 and #4 units and approximately 12.2 hectares of open space to the west. Additionally, a new warehouse will be constructed in the open space east of the existing coal bunker, a new 161kV GIS switchyard will be built near the existing #6 unit, along with operational and living quarters. Furthermore, the existing outdoor parking lot will be converted into an indoor parking lot, totaling approximately 2.2 hectares. The total planned land area for this project is approximately 14.4 hectares.

Talin Power Plant Combined Cycle Renewal Project Location
Talin Power Plant Combined Cycle Renewal Project Location

 

New Design Units Specification

Item Parameters
Unit Number 2
Unit Capacity 550MW each Unit;1,100 MW in Total
Unit Type One to One Gas Fired Combined Cycle
Plant Efficiency 61.03%(LHV, Net)
Plant Gross Heat Rate 5,899 kJ/kWh(LHV, Net)
Gas turbine In-house type, Heavy Duty, 3,600 rev./min
Steam Turbine In-house type, 3,600 rev./min
Heat Recovery Steam Generator (HRSG) In-house type, Triple Pressure Reheating
Generator Hydrogen Cooling
Main Transformer Outdoor, Oil Immersion Type

 

Progress Status

Project Progress

Overall progress(%) (September-2025)
Schedule Actual Difference
46.49 46.49 0
 
Commercial Operation Date (COD)/
Obtaining Electricity Generation license
Unit 1 Unit 2
2029/05/31 2029/06/30
 

 

Construction Status:

The Bid for Power Block has been awarded on 2025/9/12, the winning tender is GEII (General Electric International Inc)/CTCI consortium team, and project kick-off meeting was held on October 16, 2025.

Environmental Protection Planning

Related environmental protection actions can be referred to Taiwan Power Company Website and follow the following route: Information Disclose > Power Generation Information > Thermal Power Status and Performance > Environmental Protection Measures

  1. Install selective catalytic reduction system (SCR) to reduce air pollutant emissions. (The emission concentration of other power plant can be referenced)

    Pollutant Emission Concentration
    NOx 3 ppm
    SOx 8 ppm
    TSP 10 ppm