Background
To meet the long-term demand for growing electricity loads and anticipate the future large-scale grid connection of renewable energy in southern Taiwan, Taipower Company is developing a gas-fired unit renovation and reconstruction project at the Talin Power Plant (hereinafter referred to as this “the project”). The project utilizes the vacant land after the demolition of the existing #3 and #4 units and the remaining space within the plant as the primary planned land. It plans to construct two one-to-one gas fired combined cycle units with a total installed capacity of 1.1 million kilowatts.
Project Location and Scope
The project will be built within the Talin Power Plant, utilizing the vacant land after the demolition of the existing #3 and #4 units and approximately 12.2 hectares of open space to the west. Additionally, a new warehouse will be constructed in the open space east of the existing coal bunker, a new 161kV GIS switchyard will be built near the existing #6 unit, along with operational and living quarters. Furthermore, the existing outdoor parking lot will be converted into an indoor parking lot, totaling approximately 2.2 hectares. The total planned land area for this project is approximately 14.4 hectares.
New Design Units Specification
| Item | Parameters |
|---|---|
| Unit Number | 2 |
| Unit Capacity | 550MW each Unit;1,100 MW in Total |
| Unit Type | One to One Gas Fired Combined Cycle |
| Plant Efficiency | 61.03%(LHV, Net) |
| Plant Gross Heat Rate | 5,899 kJ/kWh(LHV, Net) |
| Gas turbine | In-house type, Heavy Duty, 3,600 rev./min |
| Steam Turbine | In-house type, 3,600 rev./min |
| Heat Recovery Steam Generator (HRSG) | In-house type, Triple Pressure Reheating |
| Generator | Hydrogen Cooling |
| Main Transformer | Outdoor, Oil Immersion Type |
Project Progress
| Schedule | Actual | Difference |
|---|---|---|
| 46.49 | 46.49 | 0 |
| Unit 1 | Unit 2 |
|---|---|
| 2029/05/31 | 2029/06/30 |
Construction Status:
The Bid for Power Block has been awarded on 2025/9/12, the winning tender is GEII (General Electric International Inc)/CTCI consortium team, and project kick-off meeting was held on October 16, 2025.
Related environmental protection actions can be referred to Taiwan Power Company Website and follow the following route: Information Disclose > Power Generation Information > Thermal Power Status and Performance > Environmental Protection Measures
-
Install selective catalytic reduction system (SCR) to reduce air pollutant emissions. (The emission concentration of other power plant can be referenced)
Pollutant Emission Concentration NOx 3 ppm SOx 8 ppm TSP 10 ppm